亚洲国产综合成人综合网站,97人妻人人揉人人澡人人孕妇,男人天堂av在线免费看,国产精品丝袜久久久久久不

歡迎光臨安科瑞電氣股份有限公司網(wǎng)站!
誠信促進(jìn)發(fā)展,實(shí)力鑄就品牌
服務(wù)熱線:

18202170907

產(chǎn)品分類

Product category

技術(shù)文章 / article 您的位置:網(wǎng)站首頁 > 技術(shù)文章 > Electric Monitoring solutions for Moble Towers/ba

Electric Monitoring solutions for Moble Towers/ba

更新時(shí)間:2020-12-04 點(diǎn)擊次數(shù): 953次

I.Background

  The year of 2020 is the first year of 5G , the communications industry is undergoing vigorous development,major operators and tower groups are deploying a new generation of communications base stations. The power consumption of base stations continues to rise, intelligent power monitoring and energy-saving management of communication base stations have become the research direction of various operators.

1.At the same time, the current power usage of tower base stations has the following problems:

  Electricity stealing by related personnel:

  Corresponding personnel will rely on the power supply system of the base station to connect privately used equipment.

2.Non-production energy consumption remains high:

  According to statistical analysis, the average electricity expenditure of each base station air conditioner accounts for about 54% of the entire base station electricity expenditure. Air conditioners have become the main power-consuming equipment in the base station computer room.

3.Poor system linkage:

  The base station equipment and lines cannot be controlled remotely, and the corresponding personnel cannot be notified and measures taken immediately when the line fails.

4.The number of base stations is large, the operation and maintenance burden is heavy, and the efficiency is low:

  The existing base station power supply system still cannot meet the increasing needs of users for intelligence, informatization, visualization, and easy maintenance. There is no pre-perception and judgment on the hidden dangers of the battery in the system, and the operation and maintenance personnel are required to continue to the scene Perform operation and maintenance services, and the operation and maintenance efficiency is low.

  Relying on strong R&D strength and rich industry experience, Acrel pay attention to improve the situations from both software and hardware aspects. 

II.Applications

  1.One of tower companies in the United States integrates remote power monitoring systems for towers in Africa areas. It requires to be connected into a large number of AC and DC collection meters to provide real-time, accurate and stable basic-level data for it to more effectively grasp and analyze power usage. Relying on 17 years of good reputation and strength in the power industry, Ankerui has a rich product line, excellent product quality, fast delivery cycle, strong technical support, and has passed multiple on-site field tests and compared multiple brands. Stand out, become the high-quality supplier of the group, and reach a strategic cooperation agreement.

  2.China Tower Co., Ltd. is a large state-owned communications tower infrastructure service company funded by China Mobie Communications Co., Ltd., China United Network Communications Co., Ltd., China Telecom Co., Ltd. and China Guoxin Holdings Co., Ltd. The company is mainly engaged in the construction, maintenance and operation of base station supporting facilities such as communication towers, high-speed rail subway public network coverage, and large indoor distribution systems. In 2017, Acrel customized and developed DC meters according to the requirements of Q/ZTT 1017-2015 "Technical Specifications for Base Station AC Smart Meters" and Q/ZTT 2205-2017 "Technical Requirements for Base Station DC Energy Metering Modules", which has been widely used in this project.

III.Acrel Solutions

1.Acrel Software solutions.

  1.We has developed a electric monitoring system for mobie tower/ base station.By installing AC/DC smart meters, wireless smart meters and electric monitoring system to the tower base station to complete the power-off operation during the night without business hours, reduces power consumption, reduces operating costs, and improves the real-time monitoring and protection function of the power supply line status of communication equipment; the system backstage sorts out, summarizes and summarizes the stored historical electrical performance data of the power supply line Analyze, find out the cause of the failure, give suggestions for solutions, reduce the incidence of subsequent similar failures, and improve the power supply line operation and maintenance management and control capabilities.

2.Acrel DC Meter solution

 

 

3.Acrel AC meter solution

 

 

Application:

Bibliography

1.Solutions for enterprise micro-grid system

聯(lián)


一区二区三区四区欧美日韩亚洲| 四虎成人精品一区二区| 国产一区二区日本在线观看| 久久免费少妇高潮视频| 91蜜臀综合99国产区| 欧美一级大片免费观看视频| 人妻互换免费中文字幕| 国产三级网络视频在线观看| 国产亚洲黄色在线影院| 97人妻爽人人爽人人| 日本精品一线在线观看| 欧美高清性做爰销魂在线| 国产AV无码亚洲一区二区| 天天干天天射天天日天天操| 99久久成人国产精品| 日本阿v不卡在线观看视频| 99久久无色码中文字幕人妻| 日韩一区二区三区久久久| 最新99精品视频在线观看| 漫画韩漫画免费在线观看| 日韩一二三区中文字幕在线视频精品| 国产精品久久久久一区二区三区厕所| 国产精品偷窥熟女精品视频| 久久99老妇伦国产熟女高清| 精品视频一区二区三区美女视频| 国产精品人成在线观看不卡| 欧美加勒比一区二区三区| 婷婷激情网五月天亚洲| 精品久久久久精品三级18| 久久精一区二区三区| 日韩一区二区三区久久久| 日本精品福利在线视频| 国产精品国产三级在线| 久久国产亚洲一区二区三区| 亚洲hhh视频在线看| 国产日韩一区在线观看视频| 一区二区三区欧美日本| 亚洲国产一区二区精品最新在线观看| 日本精品一线在线观看| 国产三级网络视频在线观看| 99久久国产亚洲精品美女|